SCN Rodan (CVN-01)
background
In 1999 a project called Rodan began to be implemented, the Rodan project was a project for making a nuclear aircraft carrier or CVN
In 2005 Rodan was completed and named Rodan phase I but the concept was rejected and finally replaced in 2010
In 2010 Phase II Rodan was completed and phase II Rodan was approved for production and in 2018 Rodan was completed
Operational history
On April 26, 2018 Rodan began trials on the Battlefield, to be precise during the conflict on Fort Charles Island (southwest of the main island of Neorasia), at that time there was a civil war between the Neorasia military and rebels who wanted independence, at that time Rodan was assigned to carry HBP-01 Pristine to bomb the rebel base, in the end the war ended in 2020 which was won by Neorasia
Controls
Throttle:Move Forward
AG1:Activate Weapons
AG2:-
AG3:-
AG4:-
AG5:-
AG6:-
AG7:-
AG8:Gyro
Galery
Sorry for my bad English 🗿
Thanks for the Upvote
Specifications
Spotlights
- GreatWizard 1.9 years ago
General Characteristics
- Created On Android
- Wingspan 115.3ft (35.2m)
- Length 598.3ft (182.4m)
- Height 64.9ft (19.8m)
- Empty Weight 216,871lbs (98,371kg)
- Loaded Weight 249,836lbs (113,324kg)
Performance
- Power/Weight Ratio 0.674
- Horse Power/Weight Ratio 0.004
- Wing Loading N/A
- Wing Area 0.0ft2 (0.0m2)
- Drag Points 230133
Parts
- Number of Parts 427
- Control Surfaces 0
- Performance Cost 2,637
@SHADOWCOMPANY Okay but if you want ask your friend what map is that
@SUNLIVE24 I don't know who took the screenshot is my friend
Oh yea what map is that?
@SHADOWCOMPANY Pabrika Buy this only 1