Profile image

KSS Prinz Ferdinand

16.6k Fineilldoitmyself  2.9 years ago

My first submarine attempt


KSS Prinz Ferdinand is a nuclear powered attack submarine and the lead ship of the Prinz class attack submarines. She was named after Prince Ferdinand of Howl Wind. She served for the Royal Equestrian Navy and currently in service for the Royal Sovereign Navy.

History

Name: KSS Prinz Ferdinand
Namesake: Prinz Ferdinand von Howl Wind
Ordered: April 1, 2056
Builder: Midland Eisenwerke
Cost: 245,000 Gold Bars
Laid Down: April 12, 2057
Launched: February 24, 2062
Acquired: June 6, 2063
Commissioned: June 26, 2063
Homeport: Mittelland
Motto: "Dem Licht dienen, während Sie im Dunkeln arbeiten"
Status: In active service
Badge: (Soon)

General Characteristics

Class and Type: Prinz-class Submarine
Displacement: 8,200 tons
Length: 199.5 meters
Beam: 18.4 meters
Draft: 9.8 meters
Propulsion: 1x MV44 PWR nuclear reactor, 320,000 shp (253 MW), 2x Steam Turbines, 50,000 shp (37 MW)
Speed: 21 knots (Surfaced), 38 knots (Submerged)
Test Depth: Classified
Complement: 150 officers and men


Armament/s:
27x VLS Tubes
- Beruhigen V.5
- Sonnenhai IV Cruise Missiles
6x Torpedo Tubes
- Narwhal Torpedoes


The Royal Equestrian Navy and the Royal Government were less interested in submarine warfare and mostly put force into surface warfare. However,
The Senior Admirals who served formerly in Submarine Service know the importance Submarines in warfare. Under the Befehl der Tiefseestreitkräfte, the Royal Equestrian Navy were able to build and commission new submarines.

Development

The Royal Equestrian Navy and The Royal Government were less interested in Submarine Warfare and mostly put all the project into Surface Force. The Senior Officers who formerly served for the Submarine Forces of the Royal Equestrian Navy however gave information on what's the importance of Submarines in both defensive and offensive missions. With the information, The Admiralty decided to acquire at least 30 submarines in different class' in order to make their submarine force flexible. The Submarines currently in service were also aging at the time they decided to acquire new submarines. The Government gave authorization but ultimately reduce the intended target to 15 new submarines. Because of the decision, The Admiralty and The government debated. But the King,Freiheit II, a former Submarine Commander settled the debate and decided to let the Navy build the intended target they needed. This ultimately led to the creation of Befehl der Tiefseestreitkräfte which solidify the construction of 50 new submarines for the Navy, ultimately surpassing the original target of the Navy.

The development of Prinz-class involved paperwork from the Kingdom of Crystal as Equestria was not prominent in submarine warfare. In fact, their lead ship of their aging attack submarine was built in the Shipyards of Crystal.


An attack submarine or hunter-killer submarine is a submarine specifically designed for the purpose of attacking and sinking other submarines, surface combatants and merchant vessels. In the Soviet and Russian navies they were and are called "multi-purpose submarines". They are also used to protect friendly surface combatants and missile submarines.

Great Country Attack Submarines were no different in terms of role and purpose as they were needed for both attack and defense.

Service History*

(Soon)

Images

Prince Ferdinand
Prince Ferdinand(1)
Prince Ferdinand(2)
Prince Ferdinand(3)
Prince Ferdinand(4)


Controls

  • New Controls
  • Press the corresponding Ags to activate features
  • VTOL to control depth module
  • Trim to use submerged engines
  • Missiles and Torpedoes are all independent

    • Ag1: Activate Submerged Engines

  • Throttle: forward
  • Yaw: steering
  • Trim(downward): reverse

Spotlights

General Characteristics

  • Created On Android
  • Wingspan 134.8ft (41.1m)
  • Length 654.6ft (199.5m)
  • Height 105.3ft (32.1m)
  • Empty Weight N/A
  • Loaded Weight 106,374lbs (48,250kg)

Performance

  • Power/Weight Ratio 2.763
  • Horse Power/Weight Ratio 0.112
  • Wing Loading N/A
  • Wing Area 0.0ft2 (0.0m2)
  • Drag Points 680644

Parts

  • Number of Parts 207
  • Control Surfaces 0
  • Performance Cost 1,295