Guangzhou Metro Line1 Anda Siemens
39.0k 1714
2.2 years ago
This is the first subway line in Guangzhou. It was opened in 1997. I have been on this line from Xilang to Guangzhou East Railway Station for 9 years. Now this car is about to be upgraded. The pneumatic door will become an electric door, and the motor will also be replaced
Specifications
General Characteristics
- Created On Windows
- Wingspan 8.6ft (2.6m)
- Length 59.5ft (18.1m)
- Height 11.9ft (3.6m)
- Empty Weight 145,436lbs (65,969kg)
- Loaded Weight 164,244lbs (74,499kg)
Performance
- Wing Loading 146.7lbs/ft2 (716.3kg/m2)
- Wing Area 1,119.4ft2 (104.0m2)
- Drag Points 10087
Parts
- Number of Parts 494
- Control Surfaces 4
- Performance Cost 1,726