Profile image

Guangzhou Metro Line1 Anda Siemens

39.0k 1714  2.2 years ago

This is the first subway line in Guangzhou. It was opened in 1997. I have been on this line from Xilang to Guangzhou East Railway Station for 9 years. Now this car is about to be upgraded. The pneumatic door will become an electric door, and the motor will also be replaced

General Characteristics

  • Created On Windows
  • Wingspan 8.6ft (2.6m)
  • Length 59.5ft (18.1m)
  • Height 11.9ft (3.6m)
  • Empty Weight 145,436lbs (65,969kg)
  • Loaded Weight 164,244lbs (74,499kg)

Performance

  • Wing Loading 146.7lbs/ft2 (716.3kg/m2)
  • Wing Area 1,119.4ft2 (104.0m2)
  • Drag Points 10087

Parts

  • Number of Parts 494
  • Control Surfaces 4
  • Performance Cost 1,726