Profile image

Shikuda 330

3,255 eRei18  11 months ago
140 downloads

Reya Railworks Shikuda Series

This is a 3-train Passenger Electric Multiple Unit.
Designed to be a fast commuter train, this unit can go up to 135 kmh

This train is designed for The Updated scratch's SPR map
Make sure to update your maps to fit the wider loading gauge


Stats

While having 135 kmh top speed, the train is rated at 115 kmh for safety reasons.
Reduce the speed to around 30 kmh when going through switches from the south/Northbound (East station) since you risk hitting the rail point.
You can go full speed going from the north/Southbound .


Controls

Throttle: Trim Up to go forward, Trim Down to go backward
AG1: Pantograph and start engine


This train is my experimental take on the Talgo single wheel suspension system or commonly called Independent Rotating Wheel.
Since this is an experimental build, I chose to do Low-Part count

Spotlights

General Characteristics

  • Created On Windows
  • Wingspan 10.0ft (3.1m)
  • Length 138.0ft (42.1m)
  • Height 13.3ft (4.1m)
  • Empty Weight 4,232lbs (1,920kg)
  • Loaded Weight 14,348lbs (6,508kg)

Performance

  • Wing Loading N/A
  • Wing Area 0.0ft2 (0.0m2)
  • Drag Points 12259

Parts

  • Number of Parts 189
  • Control Surfaces 0
  • Performance Cost 807
  • Log in to leave a comment
  • Profile image
    3,255 eRei18

    @DatMaluchGuy19 Idk man, not really into replica build cos I don't like detailing. Maybe I'll make low detail one (Maybe Yes Maybe No)

    11 months ago
  • Profile image
    3,255 eRei18

    @Aviator720 Thanks! The Talgo one wheel really tingles my brain when I see it the first time

    +1 11 months ago
  • Profile image
    28.1k YarisSedan

    Stockholm Metro C6 When?

    +2 11 months ago
  • Profile image
    5,346 Aviator720

    Great! No other SPR train has a wheel system like that.
    Great work!

    +1 11 months ago