Profile image

Alnas SX-79UB Fighter

6,184 Batron101  5 hours ago
80 downloads
Auto Credit Based on DrakonDynamics's Modern Fighter Challenge (Novaran Edition)

SX-79UB Fighter "Hexe"


New Generation Multirole Strike Fighter:

Link to Non-Livery Build

Operated by the Alnas Royal Air Defense Forces

Info:

As a Cheaper Alternative to the SX-69, Alnas began developing the Aircraft in tandem to the SX-69; Data from the SX-69 Program was used in quickly developing the the Hexe, After the Planning Stage, it had its first flight in Early 2019, And entered mass production in 2023, with around 2,500 Units to be Built. The Aircraft also could be used to test out new weapons for Alnas. The SX-79 has also been developed in that its internal structure and parts are simple enough that other nations could easily operate it. After several months, the First Aircrafts that rolled off the Production line were pressed into Service in 2024.

Activations:


AG-2 Machine Gun
AG-3 Parachute
AG-4 Lights
AG-5 Jettison
(Deactivate AG-8) Open Cockpit and Pull Back Wings

For the Novara Challenge

Thank You :)

Spotlights

General Characteristics

  • Predecessor Modern Fighter Challenge (Novaran Edition)
  • Created On Windows
  • Wingspan 37.2ft (11.3m)
  • Length 51.0ft (15.6m)
  • Height 10.9ft (3.3m)
  • Empty Weight 16,395lbs (7,436kg)
  • Loaded Weight 43,370lbs (19,672kg)

Performance

  • Power/Weight Ratio 1.593
  • Wing Loading 47.9lbs/ft2 (234.0kg/m2)
  • Wing Area 905.1ft2 (84.1m2)
  • Drag Points 1238

Parts

  • Number of Parts 666
  • Control Surfaces 5
  • Performance Cost 2,620